Electric Genset Complete OPS

WITH A PROFESSIONAL TEAM AND SPECIAL EQUIPMENT, AUTOSTAR HAS DELIVERED AND INSTALLED 2 GENSET – 180KVA & 250KVA FOR THE FRENCH EMBASSY IN BANGUI.

  1.  OFFLOADING GENSET AND LOGISTIC ORGANIZATION TO OUR CLIENT SITE.

2.  SETTING UP INSTALLATION.

3.  INSTALLATION OF FUEL TANK AND SUPPLY CONNECTION TO GENSET

4.  INSTALLATION OF ELECTRICAL SWITCH BOARD TO GENSET.

5.  JOB’S DONE.

autostareujacknm Uncategorized 0 Comments

PDI FOR UNOPS/MINISTRY OF PUBLIC WORK REALISED BY AUTOSTAR NOV.2019 ON TRUCKS AND HEAVY MACHINERY IN C.A.Rep

WITH A PROFESSIONAL TEAM, WE HAVE REALIZED THE PDI ON BEHALF OF BELORUSSIAN TRUCKS FACTORY “MAZ” AND BELORUSSIAN HEAVY MACHINERY “ARMKODOR” FOR THE BENEFIT OF UNOPS AND THE MINISTRY OF PUBLIC WORK.

 

AN INSPECTION DELEGATION OF THE WORLD BANK  HAS VISITED OUR TEAM TO EVALUATE THE ONGOING WORK.

DURING 15 DAYS WE HAVE PROVIDED A MECHANICAL BASIC TRAINING AND OPERATING COURSE ON THE EQUIPMENT TO END USER.

 

autostareujacknm TRUCKS 0 Comments